sept. 2021
|
|
|
|
|
STEG INTERNATIONAL
|
Project: Rabigh Power Plant- KSA .
Client: Saudi Electric Company (SEC)
Description of the work Spot:
* Maintenance Instruments Boiler.
* Maintenance Instruments Turbine.
* Maintenance Valves Turbine (MSV,GV,ICV,RCV )
|
|
août 2021
|
|
|
|
|
JUAMAH TERMINAL ONSHOR
|
Description of the work Spot:
* Engineering E&I.
* Engineering Mec (PID,ISO)
* Installation Structure SKIDS
* Installation Earthing system.
* Installation Tuyauterie Pipings
* Installation Support and Cable tray.Pulling Cable.
* Installation Electrical Panel & Instruments (VMS, PLC, JB,
PIT, PDIT, TIT TI...).
* Power system installation.
* Control and instruments system connection and
testing.
* Lighting system.
* Cathodic protection system .
* Works Instrumentation Tuyauterie Installation of
chemical skids (instruments, piping & electrical
motors)
* Pre-commissioning and Commissioning Skids
|
|
mars 2019
janv. 2020
|
ELECTRICAL & INSTRUMENTS SUPERVISOR
|
|
|
|
NAWARA CPF & Cycle Combine Rades
|
Description of the work Spot:
* Installation Earthing system
* Power system installation
* Control system installation
* Lithing system
* Cathodic protection system
|
|
févr. 2019
|
|
|
|
|
Wafa Desert Plant Inlet Gas Compression Station
|
Description of the work Spot:
* Installation of electrical and Instruments panel
* Installation tuyauterie as per PID.
* Draw of cable
* Wiring of electrical and instruments panel
* Installation the different instruments asper tuyauterier Plant PID
* Connecting cable electrical and Instruments cable
* Installation HEAT TRACING system
* Installation of chemical skids (instruments, piping &
electrical motors)
|
|
nov. 2018
|
Electrical and Instrument Supervisor
|
|
|
|
ERET INTERNATIONAL
|
|
|
nov. 2017
nov. 2018
|
ELECTRICAL SUPERVISOR
|
|
|
|
ETELEC
|
Client: OMV
Description of the work Spot:
* Installation Earthing system
* Cathodic protection system
* Lithing system
|
|
juin 2017
|
Electrical and Instrument Supervisor
|
|
|
|
ETELEC
|
Description of the work Spot:
* Installation of electrical and Instruments panel
* Draw of cable
* Wiring of electrical and instruments panel
* Installation the different instruments
* Connecting cable electrical and Instruments cable
* Installation fire detection system
* Pre-commissioning and Commissioning
|
|
janv. 2014
janv. 2016
|
Electrical and Instrument Supervisor
|
|
|
|
ETELEC
|
Sousse, Tunis
Client: STEG
Description of the work Spot:
* Installation the different instruments
* Installation of electrical and instruments panel
* Drawing of cable
* Wiring of electrical and instruments panel
* Calibration instruments
* Connecting instruments
* Installation fire detection system
* Pre-commissioning and Commissioning
|
|
nov. 2013
avr. 2014
|
electrical and Instrument Supervisor
|
|
|
|
ETELEC
|
Lavalin"
Client: STEG
Description of the work Spot:
* Installation the different instruments
* Installation of electrical and instruments panel
* Drawing of cable
* Wiring of electrical and instruments panel
* Calibration instruments
* Connecting instruments
* Installation fire detection system
|
|
avr. 2013
nov. 2013
|
electrical and Instrument Supervisor
|
|
|
|
ETELEC
|
Description of the work Spot:
* Installation the different instruments
* Installation of electrical and instruments panel
* Drawing of cable
* Wiring of electrical and instruments panel
* Calibration instruments
* Connecting instruments
* Installation fire detection system
* Pre-commissioning and Commissioning
|
|
sept. 2012
|
|
|
|
|
EL-MERK PCF
|
Description of the work Spot:
* Supervising of works and instrumentation control panels.
* Supervising of installation and connection of power
distribution boards.
* Electrical tests
* Installation fire detection system
* Pre-commissioning and Commissioning
|
|
juil. 2010
sept. 2013
|
Electrical and Instrument Supervisor
|
|
|
|
ETELEC
|
Description of the work Spot :
* Installation of equipment electrical and Instruments
* Drawing of cable
* Wiring of electrical and instruments panel
* Calibration instruments
* Connecting instruments
* Installation fire detection system
* Pre-commissioning and Commissioning
|
|
juin 2010
|
|
|
|
|
Maamoura & Baraka
|
Description of the work Spot :
* Installations of electrical and instrument equipment
* Draw of cable
* Wiring of electrical and instruments panel
* Pre- commissioning and commissioning activities
* Calibrations validation of the instruments of measures brand
Azbil" "YOKOGAWA"
|
|
sept. 2009
|
Supervisor
|
|
|
|
ETELEC
|
|
|
août 2008
|
|
|
|
|
BG Tunis
|
Description of the work Spot :
* Installation of equipment electrical and Instruments
* Drawing of cable
* Wiring of electrical and instruments panel
* Calibration of the instruments of measures
* Pre commissioning and Commissioning
* Installation of chemical skids (instruments,
piping & electrical motors)
|
|
|
|
|
|
|
ETELEC: Engineering Office
|
To Oct 2017
|
|