janv. 2021
août 2021
|
|
|
|
|
Corsica / France
|
- Diving operations with Atmospheric Diving System "ADS EXOSUIT".
|
|
janv. 2021
|
|
|
|
|
Corsica / France
|
- Preparing boat for diving equipment ADS EXOSUIT
(Atmospheric Diving System)
|
|
déc. 2020
janv. 2021
|
|
|
|
|
Corsica / France
|
- Mechanical repair of civil work machines (Corsica).
|
|
nov. 2019
janv. 2020
|
|
|
|
|
Corsica / France
|
- ROV inspection & recovery of abandoned fishing nets with
SAAB Seaeyes Falcon ROV (operation depth between 50 to
120mt) / West coast of Corsica (own equipment).
|
|
sept. 2019
nov. 2020
|
ROV inspection
|
|
|
|
Corsica / France
|
with SAAB Seaeyes Falcon ROV (own equipment).
|
|
juil. 2019
août 2019
|
|
|
|
|
Corsica / France
|
- Diving operation: Installation of x2 Long Lines for Mussel
Farming of 150m length / Fabrication & installation 2T
deadweight installed with air bag on 30m depth (Galeria).
|
|
juin 2019
juil. 2019
|
|
|
|
|
Alpes Maritimes / France
|
- Diving operation: Installation of 30m length x 8m pontoon with
(Cannes / France) from shore beach to 4m depth (anchored
piles / bolted structure).
|
|
mai 2019
juin 2019
|
|
|
|
|
Corsica / France
|
- Installation of x6 anti-erosion textile bag system (Geotubes)
30m length x 4m diameter / sand injection from shore to 3m
depth at Moriani Plage (730m3 Toyo Pump /10" pipes
/Anchoring / Excavators)
|
|
mars 2018
déc. 2019
|
|
|
|
|
Corsica / France
|
- Preparation of launching/ & recovering Frame system for
Atmospheric Diving Suit equipment (EXOSUIT N°5 / Owner) on
professional fishing boat (Owner) + Truck platform & crane
installation system for the EXOSUIT.
|
|
oct. 2017
mars 2018
|
|
|
|
|
Corsica / France
|
- Training course for the 750kw National Marine Mechanical
Officer Brevet / - LPMA Bastia (from 16 Oct. 2017 to 23 of
March 2018 )
Corsica / France
|
|
sept. 2017
déc. 2017
|
ROV inspection
|
|
|
|
Corsica / France
|
Inspection and debris removal with SAAB Seaeyes Falcon ROV
(own equipment).
|
|
juil. 2017
août 2017
|
|
|
|
|
ADS EXOSUIT Project
|
system for Atmospheric Diving Suit equipment.
|
|
janv. 2015
juil. 2017
|
|
|
|
|
YAMAL LNG - Qingdao / China - TOTAL
|
LNG Modules for Dehydration - Mercury Removal & Compressor
Train HVAC Plant / Structures Fabrication & Piping + equipment
installation (Vessels, Analyzers, Compressors..).
|
|
oct. 2014
déc. 2014
|
CDR
|
|
|
|
TOTAL E&P Indonesie
|
- South Mahakam Phase 3 Project / Borneo / Kalimantan - CDR
(Company Diving & ROV Representative (Diving Sub-Ctr::
Kreutz Subsea / ROV SONSUB). Air diving & 52m Saturation
Diving operations - Swiber RESOLUTE Barge (1000T Crane) :
7,5Km of 12" Pipe laying / 600T Jacket installation (upending
method) / Piling (280 and 500 Hydr. Hammers) / 40T x2 subsea
Buoyancy Tanks removal from Jacket legs / x4 12" Spools
installation (Saturation Diving) / P/L Free span correction by Flow
Control system from DP boat / Pipe commissioning.
|
|
mai 2014
oct. 2014
|
"ALDFG" Recovery Project
|
|
|
|
Corsica
|
otherwise D iscarded Fishing G ears) by ROV and Diving operation.
Corsica (continue Preparation of ROV recovering system for the
"ALDFG" as per ONU/FAO recommended actions) + Acquisition
plan for ADS (Atmospheric Diving Suit / Nuytco) EXOSUIT
project.
|
|
janv. 2014
mars 2014
|
Yadana Campaign 2 Operations
|
|
|
|
TOTAL E&P Myanmar
|
Cpy Site Representative & RSES on Swiber Derrick Barge
Kaizen 4000 (4000T Crane) : 2000T Jacket installation (upending
method) / 150T Flare Tower Removal / 2.200T Living Quarter &
2000T Modules removal, storage on Cargo Barge & reinstallations
on new jacket / 300T Bridge reposition / 200T Helideck removal &
re-installation / 300T x2 subsea Buoyancy Tanks removal / 150T
Boat Landing installation + Diving & ROV Cpy Representative
(Diving Sub-Ctr: Kreutz Subsea).
TOTAL E&P Myanmar
08/09/2013 to Dec./2013 - Yadana Campaign 2 (continue) - Total E&P Myanmar Project /
Cpy Site Representative for Swiber Derrick Barge Kaizen 4000 -
Procedures & Task Sheets Preparations at Singapore Swiber Offices
for next Heavy Lifting operations (planned for Jan. 2014: 2000T
Jacket / Flare Tower Removal / 2.200T Living Quarter removal &
reinstallations / 2000T Modules / 300T Bridge reposition / 200T
Helideck re-installation) + Cpy Diving& ROV Representative -
Procedures & Task Sheets Preparations + inspections of Diving &
ROV spreads - Construction Yard visits (PT Gunanussa - Cilegon /
Indonesia) prior Jacket Load out.
|
|
sept. 2013
nov. 2013
|
|
|
|
|
TOTAL E&P Myanmar
|
Representative & RSES on Swiber Derrick Barge "Kaisen 4000"
Procedures & Task Sheets Preparation for Heavy Lifting operations
(2000T Jacket / Flare Tower Removal / Live Quarter installations /
Modules / Bridge reposition / Helideck installation) + Diving &
ROV Cpy Representative for Yadana 2 Project (Diving Sub-Ctr :
Kreutz Subsea).
|
|
juin 2013
sept. 2013
|
|
|
|
|
Corsica
|
A bandoned, Lost or otherwise Discarded F ishing Gears) by ROV
and Diving operation. Corsica (Preparation of a ROV recovering
system for the "ALDFG" as per ONU/FAO recommended actions).
|
|
avr. 2013
juin 2013
|
Cpy Representative
|
|
|
|
TOTAL E&P Myanmar
|
drilling RIG Transformation for Accommodation Jack Up for
Myanmar .
|
|
févr. 2013
avr. 2013
|
|
|
|
|
TOTAL E&P Myanmar
|
Cpy Site Representative on Swiber Crane Barge PJW3000
(3000T crane). Yadana Heavy Lifting operations (Tripod Jacket /
Flare Tower installations / 130m Bridge installations / Modules /
spools = x30 lifting operations).
TOTAL E&P Myanmar
|
|
févr. 2013
déc. 2013
|
|
|
|
|
MOME
|
Emergency / OPPITO approved) at MSTS Center Johor Bahru
Malaysia /- 02 to 07 Dec.2013 (Certif. validity: 3 years).
|
|
sept. 2012
févr. 2013
|
|
|
|
|
Yadana Total E&P Myanmar Project / Cpy Representative at ASL Ship Yard ( Batam / Indonesia) Drilling RIG Transformation for Accommodation Jack Up for
|
|
|
juin 2012
sept. 2012
|
|
|
|
|
UK - Saab Seaeye
|
manipulators ROV ( Seaeye Falcon model) for / x43 ROV
operations between 100 & 135m depth.
UK - Saab Seaeye
|
|
oct. 2011
juin 2012
|
|
|
|
|
TOTAL E&P Indonesie
|
06/2012 - (x 3 days) - Falcon ROV Pilot & Maintenance 2ndtraining / Saab Seaeye.
TOTAL E&P Indonesie
10/2011 to 06/2012 - - South Mahakam Phases 1&2 Project - RSES-D - Nisconi /
Géocéan - Borneo / Kalimantan - Senipah / PJC Cpy Spt for Near
shore operation / 24" & 14" P/L installation- Procedures preparation
& operations for Near shore P/L = Push-pull + S-Laying with
Kalinda barge / Post-trenching operations (BCS Sub-Ctr) - and Cpy
Diving Representative.
|
|
juil. 2011
sept. 2011
|
|
|
|
|
Corsica
|
|
|
|
|
nov. 2010
avr. 2011
|
|
|
|
|
Statoil Project- Grand Bahamas / South Riding Point
|
Modification Project / Diving representative for main Ctr Jan
De Nul (Belgium) / Shore approach for 42" P/L - Power cables
relocation / Existing P/L removal with 2500 Bars Water jet cutting
machine / Trenching for 42" P. Line / 42" P/L Shore pull back
from offshore sheaves / 42" Riser & spools installation / Integra
hydraulic Flanges Bolts Tensioning - ROV operations.
|
|
juil. 2010
oct. 2010
|
Preparing ROV project
|
|
|
|
Corsica / France
|
hydraulic manipulators skid (Hydrolek / UK) on Seaeye Falcon
ROV + Equipment on board the boat support (marine generator /
Crane / Electrical propulsion / Deep hydr. anchoring system /++..)
|
|
nov. 2008
juin 2010
|
Superintendent
|
|
|
|
TOTAL E&P Indonesie
|
Senipah Gas Process Plant) as Cpy Construction
Superintendent for Civil Work / Structures / Spools.
- Started from Backfilling area / Fire Line Rerouting / Concrete
piles driving (crawler piling Rig with hydraulic hammer for 400 &
500mm Diam. driving) / Technical Building construction /
Foundations & Structures installation / reinforcement due to
vibrations for Pipe Racks & Pipes supports - Flare Lines
(Foundations + Support + 24' Lines installation) & Turbo
Compressor (Found / installation) Underground Piping Drainages.
Barges offloading material & heavy Lifting operations (45 T Air
Suction Coolers & 30T Air Discharges Coolers) with 225T / 50T /
45T cranes (x2 years job /x6 cranes operations in same time).
|
|
sept. 2007
oct. 2007
|
|
|
|
|
TOTAL E&P Indonesie
|
camp. Backfilling for soil elevation (River dredging) / Vertical
Drainage drilling Machines (x24.000 holes) + Horiz. dewatering
drainage system + Concrete pile driving for Jetty construction.
TOTAL E&P Indonesie
|
|
juil. 2007
août 2007
|
|
|
|
|
BATAM / TUNU 11 - PJC/CSR at SMOE Yard
|
Extension / Start Yard Fabrication for EPSC-13 Project).
|
|
mai 2007
juin 2007
|
|
|
|
|
TUNU 10 / EPSC2 - PJC/CSR at NPU site - Meindo Contractor
|
|
|
janv. 2007
mars 2007
|
Superintendent
|
|
|
|
SISI NUBI Project / EPSC2 as Cpy Construction Superintendent
|
- Installation / Pipe Crossing / Pipeline Shore Approach Realignment
for connection to installation.
TOTAL E&P Indonesie
|
|
janv. 2006
déc. 2006
|
Superintendent
|
|
|
|
SISI NUBI Project / EPSC1 as Cpy Construction Superintendent
|
A erial Pipeline / Flare Line & Piping / Structures / Diving Procedures
|
|
janv. 2005
déc. 2005
|
|
|
|
|
TOTAL E&P Indonesie
|
- (HDD) Horizontal Directional Drilling for 24" swamp Pipelines /
Swamp Piles driving (Vibro Hammers) / Cpy Diving Representative
(procedures & Ctr audits / Diving operations).
|
|
avr. 2003
déc. 2004
|
|
|
|
|
TOTAL E&P Indonesie
|
-Horizontal directional drilling for pipeline installation + piping
installation at NPU / NMP2 platform / Diving procedures and audits.
|
|
nov. 2001
févr. 2003
|
|
|
|
|
TOTAL E&P Indonesie
|
Barges / Swamp / HDD (Horizontal Directional Drilling) / Trenching /
Piping installation + Commissioning of pipes & platform (Hydro-test of
NMP2 / GTS M / K / I & L) / Gross leak test for start up / Diving
audits.
|
|
juil. 2001
sept. 2001
|
|
|
|
|
TUNU field - Company Site Rep. for UHB (Up Heavel Buckle repairs) Campaign
|
repair on davits (24" P/L) / Trenching / Diving procedures & Ctr audits.
|
|
avr. 2001
juil. 2001
|
|
|
|
|
Corsica / France
|
diving / 118m maxi working depth & currently deeper than 100m /
Surface chamber decompression system on 12m fishing boat.
Angola
|
|
mars 2001
mars 2001
|
|
|
|
|
ELF EXPLORATION
|
Field "Dynamic Installer" D.P diving Vessel. / 90m depth Saturation-
16" spools / Dog legs & Risers / x4 spools (10m to 72m lengths) x4
Risers installed (40m to 90m depth) (COB.P1 PAC F1 / PAL.P1 /
PAL.P2).
|
|
sept. 2000
nov. 2000
|
|
|
|
|
TUNU
|
|
|
juin 2000
juil. 2000
|
|
|
|
|
TUNU
|
Trenching- (Shallow water & Shore approach) / "St. Stephen" Barge.
|
|
mars 2000
avr. 2000
|
Superintendent
|
|
|
|
TOTAL E&P Indonesie
|
- 20" Pipe Line Trenching, 20 km between GTS.A to GTS D / St.
Stephen Barge (PETROSEA)
TOTAL E&P Indonesie
01/00 TUNU Field Hook Up as Cpy Construction Superintendent.
Riser installation / Pipe-Line welding connections / Spools installation
- Scaffoldings installation / Sand blasting & painting campaign.
|
|
déc. 1999
janv. 2000
|
|
|
|
|
TOTAL E&P Indonesie
|
- 24" Pipe Line Trenching, 5 km between GTS - R to GST - T
JASA MARIN BARGE (KOMARITIM) OES Trenching Spread
|
|
sept. 1999
oct. 1999
|
Superintendent
|
|
|
|
PECIKO Field as Cpy barge Construction Superintendent
|
TOTAL E&P Indonesie
09/99 to 10/99 PECIKO Field as Cpy barge Construction Superintendent.
42" Pipe Line Trenching on river crossing (Kutai Lama)
Bay Sea cable spread: STEPHEN BARGE (Indostrait)
|
|
août 1999
sept. 1999
|
|
|
|
|
TOTAL E&P Indonesie
|
42" Pipe Line Trenching on river crossing (Dondang) + Trenching 16"
& Upheaval Buckle repair JASA MARIN BARGE.
|
|
mai 1999
juil. 1999
|
|
|
|
|
TOTAL E&P Indonesie
|
- Trenching 2 x 5 km of 24" P/L.
"JASA MARIN" Barge & "OES" Spread "ARABIAN LEOPARD"
|
|
avr. 1999
mai 1999
|
Superintendent
|
|
|
|
PECIKO Field as Cpy Barge for Construction Superintendent
|
- 24" pipe laying, semi-automatic welding / Saipem Barge " CASTORO
II"
Algeria and Corsica
|
|
janv. 1994
mars 1999
|
|
|
|
|
Red coral harvesting
|
on owned 31" Diving Boat.
- Acquisition of COMEX Achilles M4 ROV (remote operating vehicle)
/ adaptation for coral harvesting.
- Preparation and construction of coral harvesting fishing boat with
aluminium decompression chamber facilities.
- Study / preparation of construction project for aluminium catamaran
with decompression unit and Diving Bell recovery for mixed gas deep
scuba diving.
Congo
|
|
janv. 1993
|
|
|
|
|
Bouygues Offshore / ELF Congo
|
Hyperbaric Welder / Diver COMEX
Repair / Tie-in on the 40" DJENO pipe at shore approach
Nigeria
|
|
janv. 1992
|
|
|
|
|
COMEX Hyperbaric Welder
|
16" P/L - x2 Tie-ins / OSO repairs: 24" P/L - x4 Tie ins on
|
|
janv. 1991
|
Shareholder / Installation Manager
|
|
|
|
Marine Fish Farming / Calvi
|
- Marine farm (bass growing) Ifremer's Submerging Cages system.
Norway
|
|
janv. 1991
|
|
|
|
|
COMEX / STATOIL Norway - Oseberg- Thor system Robot / Hyperbaric welder
|
Robot system for mechanised hyperbaric weld- Oseberg /240m depth
Nederland
- ELF PETROLAND - NOGAT Project - COMEX Hyperbaric
Saturation Welder Diver - DP DSV "Wilchief"- 36" x 17.7 mm WT
hyperbaric Tie-in (GTAW - SMAW)
|
|
janv. 1990
|
|
|
|
|
Oseberg Field / Statoil - Thor Welding
|
Diver - Hyperbaric welder / Welding Habitat technician qualification)
/ Amethyst DP Barge surface support / x2 Thor Robots remote systems
for mechanised hyperbaric welds Oper. / 40m depth saturation Diving.
Norway
|
|
janv. 1988
déc. 1989
|
Hyperbaric Welder / NDT Inspector
|
|
|
|
Hyperbaric Welder - STATOIL Gulfaks
|
hyperbaric welding / Qualification for Thor System automatic welding.
Argentina
Hyperbaric Welder / NDT Inspector SERIMER / TOTAL Argentina
- NDT Inspection /Repair for Hydra 8" Pipe Line / Air-lift P/Line
Dredging - Welding habitat installation.
Iran
1988 COMEX -Saturation Hyperbaric Welder Diver- 40m - Iranian offsh.
Oil Cpy- Foroozan P/L repair- x14 Tie-ins in 1 month (x2 welders team)
France (Port-Grimaud)
- wharf steel reinforcement / NDT Inspection / Wet welding repairs.
Norway (OSEBERG)
- COMEX Hyperbaric welder (40m depth saturation) / NorskHydro
operation North Sea Oseberg "B" Platform - 42' Bracing
replacement.
Cabinda
- MALONGO - GULF for CABGOC / PETROMAR Angola: and
hyperbaric Chamber installation / Hyperbaric welder / NDT UT
inspector on 36" load line.
|
|
janv. 1988
|
|
|
|
|
Brazil Petrobras - COMEX Diver
|
Note: from 1983 to 1988 = x15 Saturation diving operations / 120m
to 310m Depths / Namorado field. Flexibles (Coflexip) & P.L.E.M.
|
|
janv. 1987
|
|
|
|
|
GABCOK
|
1987 Qualified as COMEX Hyperbaric Welder (Welding Rods /TIG)
Libya
GABCOK - COMEX Surface supply Diver / NDT Inspector &
Constr. Diver - Homs Power Station - "Hytech" Robot x4/1Km
Galleries inspections - Diving assist. (Robot jammed inside galleries).
|
|
janv. 1986
|
|
|
|
|
Corsica - COMEX Construction Diver - Air Diving - Calvi / Corsica
|
- COMEX Saturation Diver - 120m Depth for Wellhead recoveries -
DP DSV STEPHANITURM
Italy - Sicilia
- ENI- COMEX Saturation Diver / 140m depth Wellhead recoveries -
DP DSV STEPHANITURM
|
|
janv. 1985
|
|
|
|
|
COMEX Saturation Diver - GSM PACASSA
|
-COMEX Construction Diver - Air Diving- Jacket & risers
installation - ETPM 501 Construction barge
Norway
|
|
janv. 1984
|
|
|
|
|
COMEX Saturation Diver
|
Flexible pipe laying assistance from DP DSV "SEACOM" -
|
|
janv. 1983
janv. 1984
|
|
|
|
|
PETROBRAS
|
* NAMORADO II jacket repair project: MPI, photo, CCTV, visual,
ultrasonic of node welds and grinding of cracking before grouted
clamp installation
* Drilling assistance (saturations at 240m/300m depth) Pipe cutting /
Spools install. & Wellhead dive from Rig "PETROBRAS XIII",
* Flexible pipe laying from "FLEXSERVICE 1" Laying vessel.
Cameroon
|
|
janv. 1983
|
COMEX Diver / NDT Senior Inspector
|
|
|
|
SHELL - PECTEN
|
cans Visual & UT inspection / Western POLARIS Rig.
Cameroon
|
|
janv. 1982
|
COMEX Diver / Senior Inspector
|
|
|
|
MOKOKO ABANA Field
|
Visual inspection / Mokoko Abana field / Jacket repair campaign.
Gabon
SHELL - COMEX Diver / NDT Senior Inspector - Underwater
inspection of Platforms & Pipelines on Lucina Field, HP water jetting /
visual & UT / photos, videos, Corrosion Protect. inspections.
France
|
|
janv. 1981
déc. 1994
|
|
|
|
|
COMEX Marseille
|
Hyperbaric Welder - Pipe fitter (Comex Services and SCS).
France
|
|
janv. 1981
|
|
|
|
|
COMEX - Saturation Diver
|
machine / Valves installations on Hull of sunk tanker "TANIO".
Angola
PENTAGONE 82 Rig- TOTAL Angola-
-COMEX Diver - Drilling assistance on semi-sub - 120m depth-
France
Training for preparation of Ultrasonic COFREND level 2
qualification at Ship Yard "La Ciotat" + Level 2 Certification (at
Institut de Soudure at Metz-Ennery - France).
France / International
|
|
janv. 1980
juin 1981
|
|
|
|
|
Professional Air Diver for civil work - "Hyppocampe" Cpy / La Ciotat
|
Tanker assistance.
|
|
janv. 1979
janv. 1980
|
|
|
|
|
France
|
(Spécialiste Aides aux Franchissements / Génie miitaire).
|
|