Expériences Professionnelles
avr. 2017 janv. 2018
CONSTRUCTION SUPERVISOR for WESTINGHOUSE Belgium, Nuclear plant of Tihange
Installation of Containment Filtering Venting System
ASME code

Installation of pipes, valves and supports

- Organization of the work onsite daily (prioritization of the work)
- Solving of technical issues as per the technical specifications and ASME
- Reporting of progress daily to the site manager
- Work in controlled area (Reactor building)
- Work in shift during outage

févr. 2016 mars 2017
PAINTING SUPERVISOR for AREVA EPR Olkiluoto - Finland (NPP AREVA)
Objectives: 30km of pipes to paint
12000 supports
100 painters onsite for pipes and supports

- Organize activities to be done as per project schedule (coordination
meeting, Permit to Work, confined space permit, coordination with
commissioning activities)
- Follow up of progress and report to painting site manager

avr. 2015 févr. 2016 PIPING SUPERVISOR for AREVA
EPR Olkiluoto - Finland (NPP AREVA)
Supervise the subcontractor in charge of piping installation
70 welders onsite
20000inch welded in 1 year

- Organization of the workplace (access, permit to work, confine space,
coordination with other department)
- Follow up and implementation of FCR/EEN (Field Change Request/ Engineering
Evolution
Notice)

juil. 2014 mars 2015 PIPING SUPERVISOR for DCNS
EPR Olkiluoto - Finland (NPP AREVA)
- Scheduling of workbook for installation of pipes and supports
- Coordination with documentation department for issuing workbooks
- Implementation of minor modification onsite with AREVA (technical
solution, validation via process of minor adaptation)
- Respect of Finnish safety rules onsite

oct. 2013 oct. 2013 CONSTRUCTION SUPERVISOR for Air
Liquide Near Yulin city (Shaanxi province, China)
supervise filling of cold boxes with perlite insulation (CO/CH4 unit)

- Check of closure for punch list item (sensor installations, sealing of cold boxes,
installation of remaining pipes support)
- PID check of Cold box instruments (sensor inside Cold boxes)
- Perlite filling: during filling of insulation perlite, sample are taken time to time to
ensure good quality and good density of perlite insulation

oct. 2013 juin 2014 CONSTRUCTION SUPERVISOR for Air
Liquide South East Ukraine near Donetsk - Yenakievo
piping and equipment installation for ASU plant (Air Separation Unit).
Production of O2, N2 and Ar
16000inch welded
working during evening shift (1 supervisor and 1 HSE onsite. 50 workers onsite)

- Piping installation (pipes, valves, supports, conformity as per drawing)
- Equipment installation (preparation of quality file, checking of conformity of
equipment, installation acceptance file)
- Pipe rack structure installation
- Ensure correct use of Air Liquide construction standard (oxygen service
cleanliness, piping stress free installation, no carbon contamination on stainless
steel pipe)
- Inspection Test Plan
- Preparation of Test pack for pressure test
- Reporting of progress to site manager

juin 2013 oct. 2013 CONSTRUCTION MANAGER for Air
Liquide Yima city
CO/CH4 Cryogenic Separation Unit

Follow up of the design studies:
- Provide Technical advises onsite to worker team (via process of MEMO sheets)
- Coordinate directly with Air Liquide Hanghzou (China) delivery of material
- Coordinate technical issue with Air Liquide Champigny
- Client relationship (Commercial meeting with others plants of HNCC group,
ongoing preoject in China)

Manage the construction onsite:
- Piping installation (pipes, valves, supports, check conformity as per drawing)
- Piping welding for cryogenic service (Air Liquide standard for welding WPS/PQR
and ferrite test)
- Instruments installation (tubing, sensors)
- Structure installation
- Alignment check of distillation column (correction if needed)
- Pressure test preparation
- PID conformity check (pre-commissioning)
- Follow up of design ''punch list''
- Reporting to project manager based in France
- Meeting with client (project manager and factory director) to report progress and
implement action regarding quality issues

août 2012 juin 2013
PROJECT ENGINEER for Air Liquide (Subcontractor via Vulcain Ingénierie) Champigny sur Marne - France
Cryogenic production process of O2, CO & CH4 unit
Main project was for a CO/CH4 plant in China - YIMA city
code ASME for pressurized equipment and cryogenic systems

- Design studies: follow up of design package, PID/PFD, Technical Requirement
Sheet, Piping isometrics
- QA: In charge of coordinating/solving quality issues faced during fabrication
highlighted by Air Liquide workshop - China), used of manufacturing procedures
Follow up of Non Conformity Report, Interface with quality inspectors (Air Liquide,
Samson, Roforge, DCS supplier)
- Manufacturing Schedule: closed relation with suppliers and air liquide workshop to
fulfill the scheduled delivery onsite. Interface with buyers and logistic leads on
weekly basis
(Cryogenic valves SAMSON & ROFORGE, Cryogenic turbine, Prefabricated pipes
by Air liquide China, distillation columns fabricated by Air liquid China, aluminum
heat exchangers fabricated by FIVES CRYO)
- Reporting to the project manager of progress and risk of deviation

juil. 2010 juin 2012 Deputy Project Manager at
C.M.N shipyard (Constructions Mécaniques de Normandie), Cherbourg (France)
Within the context of a Transfer of Technology of 5 military corvettes with United Arab
Emirates (UAE) government (LRS - Lloyd's Register of Shipping classified project)

- Follow up of the construction and trials of First Of Class vessel in France:
Management of the contractual scope of supply (Drawings, Preparation files, Bill of
material, procedure, Quality documents...)
- Supply for materials for vessels 2 to 6: Propulsion system, pump, accommodation
furniture, compressors...
- Sending of personal as Technical Assistance in Abu Dhabi Shipyard

avr. 2007 juin 2010 Project Coordinator at C.M.N shipyard
Constructions Mécaniques de Normandie), Cherbourg (France)
Within the context of a Transfer of Technology of 5 military corvettes with United Arab
Emirates (UAE) government (LRS - Lloyd's Register of Shipping classified project)

- In charge of transferring & coordinating outfitting tasks
- Regular travelling in Abu-Dhabi (Providing Technical Assistance)

sept. 2006 avr. 2007
MPH France
- Coordination of Factory and shipyard (FAT) class SCORPENE submarine
acceptance trials (Planning implementation, liaising for trials remarks)

janv. 2005 Trainee engineer at
Sir Joseph Isherwood Ltd Newcastle (United Kingdom)
(During summer of 2nd year of engineering school training)
ILS program:

janv. 2003 déc. 2006 Trainee engineer at C.M.N shipyard
Constructions Mécaniques de Normandie), Cherbourg (France)
CESI - placement school - industrial production management school
Trainee engineer in Propulsion and Piping design office

Diplômes et formations
sept. 2003 juin 2006 Master degree of engineering, Specialization in industrial production management - BAC+3
CESI placement school, Rouen - France

Compétences
As, Claim report, ASME, drawing, checking of, CO, CH4, closure for punch, sensor, Cold, Cold boxes, was for, Interface, files, Bill of, FAT
Centres d'intérêts
Clarinet, Saxophone, Electric bass, Sailing, Radio control models
Important
CV actualisé il y a plus de 6 mois, certaines informations peuvent ne pas être à jour.
Votre sélection

 Besoin d’aide ? Appelez-nous au 01 77 45 93 98. Nos conseillers sont à votre disposition du lundi au vendredi de 9h à 18h.