Expériences Professionnelles
janv. 2017
|
Senior Corrosion
|
|
|
|
ExxonMobil, Refinery of Fawley (UK)
|
* Maritime Terminal
* Offsite
* Higher Olefins
* Residefinates
* Public Domain and Potential Explosion Domain
* Material Degradation
* Process Review for Material Degradation issues and probability of Failure
|
|
oct. 2016
déc. 2017
|
|
|
|
|
Hewlett Packard at Liexlip (Kildare in Ireland)
|
Hydroxide Potassium Exchanger stress issues for Loos Chemical products.
|
|
janv. 2015
déc. 2016
|
|
|
|
|
Total Paris - France
|
Subsea Pipeline, Flexibles, associated structures
Welding, Material and corrosion Engineer
|
|
déc. 2014
sept. 2016
|
|
|
|
|
Welding and Material Engineer for Strathom France (Paris)
|
|
|
déc. 2014
|
|
|
|
|
Welding, Material and corrosion Engineer for Technip -Strathom France (Paris - La Defence)
|
Scope of works:
* MOHO NORD Subsea - Umbilical Design, fabrication and various side equipments associated
to Umbilicals.
* Various Installation aids for Umbilical, Flexible and pipeline installation.
* Subsea connectors.
* Metallurgy and Corrosion with strong focus on Super Duplex Stainless Steel and Low
Alloyed Steels.
|
|
janv. 2014
|
|
|
|
|
Pacific Northwest LNG Canada LNG
|
|
|
janv. 2014
|
|
|
|
|
ENOC Processing Company LLC Emirates
|
|
|
janv. 2013
déc. 2014
|
|
|
|
|
Welding and Material Engineer for KBR Greenford (UK)
|
Scope of works:
* PNWLNG LNG plant FEED Material Selection Process and Various other LNG project (Saint
John LNG, ENI Mozambic FLNG)
* ENOC Processing Company LCC Refinery extension Material Selection Process
|
|
janv. 2008
janv. 2014
|
Lead Welding and Material engineer
|
|
|
|
Agip KCO for Shell / Total / ENI / ExxonMobil / Conoco Philips / Kazmunai oil and Gas Kazakhstan
|
Full integrated offshore Oil and Gas field and Onshore installation
All related to welding, Material and Corrosion
Lead Welding and Material engineer
|
|
janv. 2008
janv. 2013
|
Welding
|
|
|
|
Welding and Material Engineer for KBR leatherhead (UK)
|
Lead Welding and Material engineer for AGIP KCO, in charge of onshore and offshore scope of
work. AGIP KCO Technical Authority for Welding, Material and NDT issues.
Scope of work for AGIP KCO (Welding, Material, NDT, Painting, Coating, Corrosion etc..) on
following scope of works:
* Central Engineering and Design Integrity engineering team - welding and Material for
onshore, offshore and the Cluster systems:
* Island D and A Offshore HUC Fabrication and Installation
* Islands EPC2, 3, 4 and HUB 1 and 2.
* Pipe rack Fabrication
* Ancillary steel work Fabrication
* Process barges Fabrication and Installation (
* Pipeline, trunkline, Umbilicals, Pigtraps, etc..
* Piles and Flares
* Manifolds
* Well head systems
* Barges and IBEEVs (Ice classes)
* Instrumentation
* Follow up of Contractors and Suppliers
As a summary, as welding and material engineer the scope of work on Kashagan project
extends to every part of this project which includes metallic materials and Non-Metallic
Materials, welding, corrosion, NDT and understanding/comprehension/knowledge of the
processes.
First Half of 2008: Contract as welding Manager for DSD Ferrometalco Cairo and Belbeis (Egypt), here
below summary on main project running:
* UHDE GmbH
EAGRIUM Project - Damietta, Egypt
PDH & PP Project - Port Said, Egypt
* ARCHIRODON CONSTRUCTION (overseas) Co
SA CAIRO WEST THERMAL POWER PLANT (UNITS 7& 8)
* ANSALDO CALDAIE s.p.a
EL-TEBBIN THERMAL POWER PLANT
PIPING
* ORASCOM construction industries
Syria Cement Factory
* GAMESSA
ZAAFRANA Wind Towers
* ALSTOM Power inc,
GRAIN HRSG's
STAYHORPE HRSG's
AGHADA HRSG
Drum Saddle Support Beams for AGIOS NIKOLAOS CCPP
Lifting Frame for AGIOS NIKLAOS CCPP
Drum Saddle Support Beams for ALIVERI V CCPP
Fabrication of Carbon Steel & Alloy (P11, P22&P91) Piping
Fabrication of Carbon Steel & Alloy (P11, P22&P91) Piping
* BECHTEL
Doha airport Qatar
* KBR
Ammonia tanks Ain Sukhna
|
|
janv. 2007
|
Contract as Project
|
|
|
|
ARNO yard Dunkirk (France)
|
* Repair and conversion of CSO Deep Pioneer (Technip UK), including installation of
Carousel for Agbami project Flexible flowline laying.
|
|
janv. 2007
|
|
|
|
|
Technip UK France
|
Project Engineer
|
|
janv. 2005
déc. 2008
|
Welding and Material engineering
|
|
|
|
Chevron Angola OOL
|
|
|
janv. 2005
déc. 2007
|
Offshore oil and gas field installation
|
|
|
|
Chevron Angola
|
|
|
janv. 2005
déc. 2006
|
Offshore oil and gas field
|
|
|
|
Exxon Mobile Angola
|
Welding and Material engineering
Welding and Material engineer
|
|
janv. 2004
janv. 2007
|
|
|
|
|
ACERGY (Subsea 7)
|
* Block 14 project (CABGOC field for Chevron) that included flowlines, risers and coil in
piggy back. Project performed on Seaway Orion.
* Girassol project (Total), investigation and repair of broken flowlines.
* EPC2B (Exxon) with objective to release previous welding engineer and continue the
project to the end. This project included LNG flowlines, risers, topsides of jackets,
and pig launchers and receivers. The main personal performance was to integrate a
project and find solutions and take over fabrication and integration.
* Greater Plutonio Block 18 (BP) flowlines, riser tower, buoyancy tank and OOL.
* Agbami OSC OOL (Chevron), Most of the job has been to define fatigue requirements (full
scall fatigue tests), prepare welding requirements based on fatigue results, define
acceptance requirements for AUT, run fatigue test program to validate the choices and
start fabrication on site.
* Tombua Landana Project Block 14 (Chevron). This project include 2 flowlines some spools
and risers and 2 horizontal Hot tapping on existing flowlines.
* Tendering Work on Pazflor flowlines and OOL (Total)
* Tendering Work on OSO project (Total)
* Tendering Work on Ebouri facility project (Vaalco Gabon)
* Tendering Work on Libondo project (Total Congo)
* Technical presentation of Acergy for West Med Development projects (Nalpetco)
* Work on multiple Tender on various projects (flowlines production, gas export/imports,
FLETs, PLETs, Manifolds, risers, etc...)
|
|
janv. 2004
déc. 2006
|
|
|
|
|
BP Angola
|
Welding and Material engineering
Welding and Material engineer
|
|
janv. 2004
janv. 2005
|
|
|
|
|
Chevron Angola
|
Welding and Material engineer
|
|
janv. 2003
janv. 2004
|
|
|
|
|
DCN (French Navy - submarine division) France
|
Fabrication of Prototype Nuclear Engine
Welding and Material engineering
Welding and Material engineer
|
|
janv. 2003
janv. 2004
|
Welding Engineer
|
|
|
|
Entrepose Contracting Arles (France)
|
* Fabrication of LNG and LPG tankers.
* Fabrication of a Nuclear engine prototype for DCN Submarines with Technicatom
|
|
janv. 2003
|
|
|
|
|
l'Atlantique in St Nazaire (France)
|
works on steel hulls ("Queen Mary 2", LNG Vessel "Gaz de France")
|
|
janv. 2002
|
|
|
|
|
5 months in ALCAN at Laterrière (Quebec)
|
expedition lines of aluminium blocks.
|
|
janv. 2001
|
|
|
|
|
months in VDM Krupp GmbH at Altena (Sauerland in Germany)
|
for combustion chamber of Gas Turbines (main research on Alloy 230).
|
|
janv. 2000
|
|
|
|
|
months in Sollac (now called MITTAL steel) Dunkirk (France)
|
sheets coils production.
|
|
janv. 1999
|
|
|
|
|
Dillingen Hütten Werke at Dillinger (Saarland in Germany)
|
optimisation of work process for the quarto laminar (heavy wall thickness steel plates).
|
|
janv. 1998
|
|
|
|
|
Hewlett Packard at Liexlip (Kildare in Ireland)
|
(production of ink pen for printers).
|
|
|
|
|
|
|
ExxonMobil Technip
|
Previous Employer
ExxonMobil
Technip
KBR/AGIP/ENI
DSD
ARNO
ACERGY/SUBSEA7 (Stolt Offshore)
Entrepose Contracting
|
|
|
|
|
|
|
France Germany
|
Plant Locations
France Germany
Quebec United Kingdom
Major Clients
AGIP/ENI Alstom
KBR Bechtel
Technip Chevron
ExxonMobil BP
Total
|
|
|
|
|
|
|
Scotland and England Norway Angola Egypte
|
Russia
|
|
|
Offshore
|
|
|
|
Scotland and England Norway Angola Egypte
|
France
Offshore
|
|
Diplômes et formations
sept. 2016
juin 2017
|
Maritime Expert Master Degree
- BAC+4
|
|
|
|
ENSM (Ecole National Superieur Maritime - French Maritime Academy) and Universite du Havre
|
|
oct. 2016
|
to "on-going part time": Maritime Expert Master Degree at
- BAC+4
|
|
|
|
ENSM (Ecole National Superieur Maritime - French Maritime Academy)
|
|
sept. 2008
juin 2014
|
Extensive upgrade through KBR University in structural
- BAC+3
|
|
|
|
|
|
juin 2006
|
AUT interpretation training course at TWI on RD-tech
- BAC+3
|
|
|
|
system
|
|
sept. 2002
juin 2003
|
Master at the ESSA; Postgraduate welding; EWE; IWE Diplomas
- BAC+4
|
|
|
|
welding institute; European and International Welding Engineer
|
|
sept. 2001
juin 2002
|
Master in mechanical engineering; language education; Master in
- BAC+4
|
|
|
|
ETS college of Montreal (Ecole de technologie supérieure); GILL college of Montreal; ISIV college (Institut Superieur industriel de Valenciennes)
|
|
sept. 1999
juin 2001
|
Generalist Engineering Formation at
|
|
|
|
ISIV college (Institut supérieur industriel de Valenciennes)
|
|
sept. 1998
juin 1999
|
Mechanical and Production engineering graduate
- BAC+3
|
|
|
|
at the university of Villeneuve d'Ascq in France
|
|
sept. 1995
juin 1998
|
Preparation for the French Engineering
- BAC+3
|
|
|
|
University competition at ICAM in France
|
|
juin 1995
|
High school diploma
|
|
|
|
with focuses on Engineering Sciences
|
|
Compétences
learning, maintenance plan, Authority for Welding, Welding, Material, NDT, Painting, Coating, As, CCPP, CABGOC field for, OSC, requirements for AUT, Project Block 14, Chevron
Compétences linguistiques
Centres d'intérêts
Golf, fly-fishing, Speedsail, Windsurf, rugby
|